Project Management

Payments should be based on performance

I don't ever want my clients to pay designers or developers by the hour. That's stupid and leads to massive overspending. Instead, I try to use all the guidelines we have here to keep the project on track and costs under control.

I suggest you have lots of milestones where payment is keyed to specific achievement. That puts the responsibility on the developer to come in with the good estimate that forms your starting point. Change orders modify the basic plan. Each change order should have both a dollar amount and description of the achievement milestone that generates the payment.

Make this a part of your Request for Proposal so that developers and designers know what they're getting into. Then be disciplined about paying only for achievement, but also fair and flexible when things need to be done differently than you originally planned.

You may reprint or repost this material providing that the following conditions are met:

  • The piece remains essentially unaltered.
  • Wally Bock is shown as the author.
  • The notice Copyright 2003 by Wally Bock or similar appears on the article.
  • Contact information for Wally is included with the article. You may refer readers to this Web site as a way to meet this requirement, or refer them to this site or use the information on our contact page.

Any other reprinting or reposting requires specific permission which is almost always granted. Click here to request permission if necessary.

Top of page

 

sandyrowley.com creative web site and graphic design
© 2003 Wally Bock. Click for Contact Information.